The machine of 20t weight required coordinated work of two cranes and the transport took the time until the late night. In the hall, there are three narrow spaces limited by the stanchion columns offering only 1,5 cm clearance at each side. Thanks to outstanding cooperation of the whole team and the abilities of the forklift truck operators the machine travelled the track without a scratch. The machine has been placed to its site and we are working on putting it into operation.